Difference between revisions of "Chapter 9"
From GARDGuide
(New page: == 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== * 9.1 ** 9.1.1 Management ** 9.1.2 Performance Assessment (PA) * 9.2 Designing for Closure ...) |
|||
Line 1: | Line 1: | ||
== 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== | == 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== | ||
− | * 9.1 | + | * 9.1 Managing and Assessing |
** 9.1.1 Management | ** 9.1.1 Management | ||
** 9.1.2 Performance Assessment (PA) | ** 9.1.2 Performance Assessment (PA) |
Revision as of 04:15, 13 December 2007
9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)
- 9.1 Managing and Assessing
- 9.1.1 Management
- 9.1.2 Performance Assessment (PA)
- 9.2 Designing for Closure
- 9.3 Disciplines, Knowledge and Experience Requirements
- 9.4 Developing an ARD Management Plan (MP)
- 9.4.1 Defining the Problem
- 9.4.2 ARD, NMD and Saline Drainage
- 9.4.3 Gathering Data and Information
- 9.4.4 Generating Multiple Solutions
- 9.4.5 Analyzing and Selecting a Solution
- 9.4.5.1 Modelling and Assessment
- 9.4.5.2 Selecting a Solution
- 9.4.6 Testing the Solution
- 9.4.6.1 Testing Assumptions and Designs
- 9.4.6.2 Risk Assessment and Management
- 9.4.7 Assembling the ARD Management Plan
- 9.5 Implementing the ARD Management Plan
- 9.5.1 Mine Planning and Design
- 9.5.2 Construction
- 9.5.3 Operations
- 9.5.4 Monitoring Performance
- 9.5.5 Adjusting and Modifying the Plan
- 9.5.5.1 Data Retention
- 9.5.5.2 Closure Considerations
- 9.5.5.3 ARD Management FAQ's
- 9.5.5.4 References