Chapter 9

From GARDGuide
Revision as of 21:45, 22 October 2007 by WikiSysop (talk | contribs) (New page: == 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== * 9.1 ** 9.1.1 Management ** 9.1.2 Performance Assessment (PA) * 9.2 Designing for Closure ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)

  • 9.1
    • 9.1.1 Management
    • 9.1.2 Performance Assessment (PA)
  • 9.2 Designing for Closure
  • 9.3 Disciplines, Knowledge and Experience Requirements
  • 9.4 Developing an ARD Management Plan (MP)
    • 9.4.1 Defining the Problem
    • 9.4.2 ARD, NMD and Saline Drainage
    • 9.4.3 Gathering Data and Information
    • 9.4.4 Generating Multiple Solutions
    • 9.4.5 Analyzing and Selecting a Solution
      • 9.4.5.1 Modelling and Assessment
      • 9.4.5.2 Selecting a Solution
    • 9.4.6 Testing the Solution
      • 9.4.6.1 Testing Assumptions and Designs
      • 9.4.6.2 Risk Assessment and Management
    • 9.4.7 Assembling the ARD Management Plan
  • 9.5 Implementing the ARD Management Plan
    • 9.5.1 Mine Planning and Design
    • 9.5.2 Construction
    • 9.5.3 Operations
    • 9.5.4 Monitoring Performance
    • 9.5.5 Adjusting and Modifying the Plan
      • 9.5.5.1 Data Retention
      • 9.5.5.2 Closure Considerations
      • 9.5.5.3 ARD Management FAQ's
      • 9.5.5.4 References