Difference between revisions of "Chapter 9"
From GARDGuide
Line 1: | Line 1: | ||
== 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== | == 9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)== | ||
− | + | : [[Guide9.1|9.1 Managing and Assessing]] | |
− | + | :: 9.1.1 Management | |
− | + | :: 9.1.2 Performance Assessment (PA) | |
− | + | : [[Guide9.2|9.2 Designing for Closure]] | |
− | + | : [[Guide9.3|9.3 Disciplines, Knowledge and Experience Requirements]] | |
− | + | : [[Guide9.4|9.4 Developing an ARD Management Plan (MP)]] | |
− | + | :: 9.4.1 Defining the Problem | |
− | + | :: 9.4.2 ARD, NMD and Saline Drainage | |
− | + | :: 9.4.3 Gathering Data and Information | |
− | + | :: 9.4.4 Generating Multiple Solutions | |
− | + | :: 9.4.5 Analyzing and Selecting a Solution | |
− | + | ::: 9.4.5.1 Modelling and Assessment | |
− | + | ::: 9.4.5.2 Selecting a Solution | |
− | + | :: 9.4.6 Testing the Solution | |
− | + | ::: 9.4.6.1 Testing Assumptions and Designs | |
− | + | ::: 9.4.6.2 Risk Assessment and Management | |
− | + | :: 9.4.7 Assembling the ARD Management Plan | |
− | + | : [[Guide9.5|9.5 Implementing the ARD Management Plan]] | |
− | + | :: 9.5.1 Mine Planning and Design | |
− | + | :: 9.5.2 Construction | |
− | + | :: 9.5.3 Operations | |
− | + | :: 9.5.4 Monitoring Performance | |
− | + | :: 9.5.5 Adjusting and Modifying the Plan | |
− | + | ::: 9.5.5.1 Data Retention | |
− | + | ::: 9.5.5.2 Closure Considerations | |
− | + | ::: 9.5.5.3 ARD Management FAQ's | |
− | + | ::: 9.5.5.4 References |
Revision as of 03:29, 18 December 2007
9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)
- 9.1 Managing and Assessing
- 9.1.1 Management
- 9.1.2 Performance Assessment (PA)
- 9.2 Designing for Closure
- 9.3 Disciplines, Knowledge and Experience Requirements
- 9.4 Developing an ARD Management Plan (MP)
- 9.4.1 Defining the Problem
- 9.4.2 ARD, NMD and Saline Drainage
- 9.4.3 Gathering Data and Information
- 9.4.4 Generating Multiple Solutions
- 9.4.5 Analyzing and Selecting a Solution
- 9.4.5.1 Modelling and Assessment
- 9.4.5.2 Selecting a Solution
- 9.4.6 Testing the Solution
- 9.4.6.1 Testing Assumptions and Designs
- 9.4.6.2 Risk Assessment and Management
- 9.4.7 Assembling the ARD Management Plan
- 9.5 Implementing the ARD Management Plan
- 9.5.1 Mine Planning and Design
- 9.5.2 Construction
- 9.5.3 Operations
- 9.5.4 Monitoring Performance
- 9.5.5 Adjusting and Modifying the Plan
- 9.5.5.1 Data Retention
- 9.5.5.2 Closure Considerations
- 9.5.5.3 ARD Management FAQ's
- 9.5.5.4 References