Chapter 9

From GARDGuide
Revision as of 03:29, 18 December 2007 by WikiSysop (talk | contribs)

9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)

9.1 Managing and Assessing
9.1.1 Management
9.1.2 Performance Assessment (PA)
9.2 Designing for Closure
9.3 Disciplines, Knowledge and Experience Requirements
9.4 Developing an ARD Management Plan (MP)
9.4.1 Defining the Problem
9.4.2 ARD, NMD and Saline Drainage
9.4.3 Gathering Data and Information
9.4.4 Generating Multiple Solutions
9.4.5 Analyzing and Selecting a Solution
9.4.5.1 Modelling and Assessment
9.4.5.2 Selecting a Solution
9.4.6 Testing the Solution
9.4.6.1 Testing Assumptions and Designs
9.4.6.2 Risk Assessment and Management
9.4.7 Assembling the ARD Management Plan
9.5 Implementing the ARD Management Plan
9.5.1 Mine Planning and Design
9.5.2 Construction
9.5.3 Operations
9.5.4 Monitoring Performance
9.5.5 Adjusting and Modifying the Plan
9.5.5.1 Data Retention
9.5.5.2 Closure Considerations
9.5.5.3 ARD Management FAQ's
9.5.5.4 References