Difference between revisions of "GuideTOC"

From GARDGuide
(3.0 Chapter 3: Corporate, Regulatory And Community Framework (John Wates))
(4.0 Chapter 4: Defining The Problem – Characterization (Devin Castendyk))
Line 78: Line 78:
 
* [[Guide4.8|4.8 Chapter Conclusions ]]
 
* [[Guide4.8|4.8 Chapter Conclusions ]]
 
* [[Guide4.9|4.9 References ]]
 
* [[Guide4.9|4.9 References ]]
 +
 +
[[#top|Top of this page]]
  
 
== 5.0 Chapter 5: Prediction (Kirk Nordstrom)==
 
== 5.0 Chapter 5: Prediction (Kirk Nordstrom)==

Revision as of 02:54, 18 December 2007

1.0 Chapter 1: The GARD Guide

  • 1.1 Introduction
  • 1.2 ARD Management - The Business Case
  • 1.3 Scope and Objectives of the GARD Guide
  • 1.4 Relation to other guides
  • 1.5 Approach of the GARD Guide
    • 1.5.1 ARD/NMD/SD
    • 1.5.2 Mine Phase
    • 1.5.3 Facility
    • 1.5.4 Climate
    • 1.5.5 Commodity
  • 1.6 Sustainability
  • 1.7 Layout and How to Use

2.0 Chapter 2: The ARD Process (Rens Verburg)

3.0 Chapter 3: Corporate, Regulatory And Community Framework (John Wates)

Top of this page

4.0 Chapter 4: Defining The Problem – Characterization (Devin Castendyk)

Top of this page

5.0 Chapter 5: Prediction (Kirk Nordstrom)

6.0 Chapter 6: Prevention And Mitigation (Ward Wilson)

7.0 Chapter 7: Drainage Treatment (Andre Van Niekerk)

8.0 Chapter 8: Monitoring (Peter Chapman)

9.0 Chapter 9: Management And Performance Assessment (Karen Clarke-Whistler/Andy Robertson)

10.0 Chapter 10: ARD Communication and Consultation (Tisha Greyling)

11.0 Chapter 11: ARD Management & Sustainability Framework (Beth Beloff)

  • 11.1 Introduction
  • 11.2 Developing Industry, Regulatory and Community Approaches
  • 11.3 Ongoing Research
  • 11.4 Conferences and Training
  • 11.5 ARD Technology FAQ's

12.0 References

Tables

Figures

  • Figure 1: Road Map for the Global Acid Rock Drainage Guide
  • Figure 2: Generic Mine Water System Indication Potential Drainage Treatment Plant Positions
  • Figure 3: Generic Range of Drainage Treatment Technologies
  • Figure 4: The risk-based approach in concept, depicting the relationships between the contaminant (source), the receptor and the pathway that connects them
  • Figure 5: Implementation of a risk based approach

Appendices

  • Appendix A Title
  • Acronyms
  • Glossary
  • Units and Conversion Factors
  • General Further Reading
  • Case Studies Listing
  • ARD Consultant Terms of Reference